Marshall Wilkinson
ALP
ConstructLinePowered by ALP
Sign In
Limited Release — Proprietary Construction Tools

ConstructLine

Powered by ALP

Professional construction-grade tools developed by ALP for construction professionals

CPM Scheduling. Quantity Takeoff. Cost Library.Built on $2.5B+ in real construction experience. Try it free.

Built by Contractors

Developed by ALP — $2.5B+ in construction experience. These aren't generic tools. They're built for how contractors actually work.

Save Hours Every Week

Stop wrestling with spreadsheets and outdated software. ConstructLine tools are fast, intuitive, and purpose-built for construction.

Win More Work

Professional schedules and accurate takeoffs set you apart from competitors. Show owners you run a real operation.

ConstructLine
Powered by ALP

CPM Scheduler

Critical Path Method scheduling built for the field. The same methodology used on billion-dollar projects — now accessible to every contractor.

ConstructLine CPM Scheduler — Water Treatment Plant Gantt Chart

Full CPM schedule with Gantt chart, WBS hierarchy, and critical path highlighting

Activity Details — edit properties, relationships, and schedule

Activity Details & Dependencies

Edit every property — duration, WBS, constraints, bar color. Link predecessors and successors with FS, SS, FF, SF relationships and lag.

Advanced Filters — filter by activity ID, WBS, critical path, float, dates, and activity codes

Advanced Filtering

Filter by activity ID, name, WBS, critical path, float range, date range, and activity codes. Isolate exactly what you need for any meeting.

ConstructLine CPM Scheduler — Smith Residence with submittals, fabrication, and procurement tracking

Residential project with submittals, fabrication, and procurement tracking — from contract signing to final completion

ConstructLine CPM Scheduler — Schedule annotations with text boxes, arrows, and shading to highlight delays and critical issues

Annotate your schedule with text boxes, arrows, and shading — highlight delays, flag issues, and export annotated PDFs for owner meetings

Resources & Cost Loading — define labor, equipment, materials with cost rates

Resources & Cost Loading

Define labor, equipment, materials, and subcontractors with cost rates. Track budgeted vs. actual costs across your entire project.

Resource Assignments — assign resources to activities and track budgeted vs actual costs

Resource Assignments

Assign resources to activities with units/day. See budgeted costs calculated automatically. Track actual costs as work progresses.

Built-In Reports

Professional Reports — Ready to Print

Generate the reports owners and GCs actually ask for. Export to CSV or print directly.

Total Float Report — activity-level float analysis with critical path identification

Total Float Report

Activity-level float analysis. See total float, free float, critical path status, and early/late dates for every activity.

Cash Flow S-Curve — budgeted vs actual cost tracking over project duration

Cash Flow S-Curve

Visualize project cash flow over time. Track budgeted vs. actual spending with weekly detail breakdowns.

Resource Histogram — weekly resource loading by trade across project duration

Resource Histogram

See weekly resource loading by trade. Plan manpower, identify overallocation, and level resources before you hit the field.

Schedule Health Score — automated schedule quality assessment with grading

Schedule Health Score

Automated schedule quality assessment. Grades your schedule on float distribution, critical path integrity, logic density, resource balance, and progress.

Drag-and-drop Gantt chart
Automatic critical path calculation
Baseline tracking & variance
WBS hierarchy with color coding
Day/Week/Month zoom views
CSV import & export
DD & Set data date
Print-ready PDF reports
Schedule annotations & markup
Excel import & re-import
ConstructLine
Powered by ALP

Quantity Takeoff

AI-powered quantity estimating. Upload your blueprints and get a full CSI-coded estimate with 851+ line items — in minutes, not days.

ConstructLine Quantity Takeoff — Drawing Sheets with 23 analyzed construction plans

Upload construction drawings — ConstructLine indexes, classifies, and analyzes every sheet automatically

851 line items across 18 CSI divisions — $1.7M estimated

851 Line Items, 18 CSI Divisions

Every item coded to CSI MasterFormat with quantities, units, unit costs, extended costs, and confidence scores. Review and verify each one.

Bid Markup Calculator — Labor, Overhead, Profit, Bonds, Contingency

Bid Markup Calculator

Add Labor, Overhead, Profit, Bonds, and Contingency percentages on top of your material takeoff total. Build your full bid number in one click.

Line item detail — drawing reference, notes, quantity, unit cost, confidence

Full Item Detail & Drawing Reference

Click any line item to see the source drawing, your notes, QTY, unit, cost, and confidence score. Mark items as reviewed or edit inline.

On-plan measurement tool — draw lines, areas, and counts directly on blueprints

On-Plan Measurements

Draw lines, rectangles, and counts directly on the blueprint. Scaled measurements with color-coded layers. Export to CSV or apply to line items.

Line item with saved measurements — 39.8 LF measured, 19 counted

Measurements Linked to Line Items

Your on-plan measurements save directly to each line item. Apply measured quantities or use ConstructLine-suggested values. Full audit trail.

ConstructLine Consolidate & Enhance — merging and refining results across all 23 sheets

Consolidate & Enhance

After initial extraction, ConstructLine merges duplicate items, refines quantities, and recalculates costs across all sheets. One click to enhance your entire estimate.

AI-powered plan analysis
20+ CSI divisions detected
On-plan measurement tools
Bid markup calculator
Regional cost adjustments
Excel & CSV export
Multi-page PDF support
Consolidate & Enhance AI
ConstructLine
Powered by ALP

Cost Library

Your pricing database. Always current.

Build and maintain a centralized cost library with your real-world pricing data. Reference it during takeoffs and estimates to produce accurate bids faster.

  • Organize costs by CSI division or custom categories
  • Unit cost tracking with material + labor breakdown
  • Import/export for team-wide consistency
  • Integrates with Quantity Takeoff for instant estimates

Cost Library

Centralized pricing database for your construction business.

ConstructLine — Powered by ALP

$2.5B+

In construction experience

100%

Built for contractors

Free

To try — no credit card

Free Access — No Credit Card Required

Try ConstructLine Today

Powered by ALP

Create your free account and start using professional construction tools in under 60 seconds.

Already have an account?

What's Included — Free

  • CPM Scheduler — Full access
  • Quantity Takeoff — Full access
  • Cost Library — Full access
  • No credit card required
  • No time limit

Limited Release

Proprietary Contractor Circle

ConstructLine

ConstructLine is part of the ALP Contractor Circle — live coaching, battle-tested templates, replay library, and the full ConstructLine suite. Everything you need to scale your construction business.